More flooring and more mysteries

In the central room more pottery was found as well as a lock, possibly from a wooden trunk and a wooden panel wrapped round with metal (zinc?). 

We also started to redraw the plan of the structure to incorporate some recent features discovered.
Work planned for Monday 4th November was cancelled because of the dreadful weather. All being well, excavation will continue next Monday 11th November at 10am. All welcome!